How a film budget is divided

Distinguish above-the-line, below-the-line, post, and contingency without pretending the percentages are universal.

A budget is a classified list of expected costs. Above-the-line usually means story, producer, director, and principal cast. Below-the-line means the physical crew, locations, equipment, and materials. Post-production and marketing may live in other sections. Contingency is a percentage held back because estimates are wrong in ordinary ways. There is no honest universal split. An animation feature and a two-person road movie should not be forced into the same pie. What you can learn is the discipline: every dollar is in a department, every department has a name, and “miscellaneous” is where films go to leak. When you use the allocator on this site, the percentages are yours. The tool only checks that they add to 100.

Steps

  1. List the departments your film actually has.
  2. Assign percentages and make them sum to 100.
  3. Write one sentence justifying the largest department.
  4. Add contingency as its own line rather than hiding it.

Terms

  • Above the line — A traditional budget region for key creative deals. The metaphor is historical.
  • Contingency — A reserve for error, not a slush fund to hide overruns after the fact.

Check

Contingency is best described as:

  • Proof the budget is padded dishonestly
  • A named reserve for estimating error
  • The same thing as profit

Answer: A named reserve for estimating error

It is a planning reserve. It is not profit and not a moral failing.