How a film budget is divided
Distinguish above-the-line, below-the-line, post, and contingency without pretending the percentages are universal.
A budget is a classified list of expected costs. Above-the-line usually means story, producer, director, and principal cast. Below-the-line means the physical crew, locations, equipment, and materials. Post-production and marketing may live in other sections. Contingency is a percentage held back because estimates are wrong in ordinary ways. There is no honest universal split. An animation feature and a two-person road movie should not be forced into the same pie. What you can learn is the discipline: every dollar is in a department, every department has a name, and “miscellaneous” is where films go to leak. When you use the allocator on this site, the percentages are yours. The tool only checks that they add to 100.
Steps
- List the departments your film actually has.
- Assign percentages and make them sum to 100.
- Write one sentence justifying the largest department.
- Add contingency as its own line rather than hiding it.
Terms
- Above the line — A traditional budget region for key creative deals. The metaphor is historical.
- Contingency — A reserve for error, not a slush fund to hide overruns after the fact.
Check
Contingency is best described as:
- Proof the budget is padded dishonestly
- A named reserve for estimating error
- The same thing as profit
Answer: A named reserve for estimating error
It is a planning reserve. It is not profit and not a moral failing.
Last reviewed 2026-10-27.